Last evening, the Canadian Institute of Steel Construction recognized UHN’s Toronto Western Hospital Stack project, a vital part of the hospital’s Powerhouse Redevelopment. Congratulations to our client, UHN - the University Health Network, Milman & Associates, the structural engineering team, PCL Construction and Ellesmere Fabricators. HH Angus served as prime consultant and M&E engineers. The generator exhaust stack won in the category of Steel Works – Sculptures – Outdoor Pavillions.