Scotiabank

Ecosystem Program

The Scotiabank Ecosystem Program represented a comprehensive one million ft2 ‘refresh’ for floors and offices in downtown Toronto. The most pressing challenge was the schedule, which was both complex and compressed; for example, drawings for three floors were delivered in only three to four weeks, a more typical timeframe for design of a single floor.

Another challenge was implementing a design standard for existing buildings and infrastructure that differed by location. Often, the only common elements were architectural treatment and power supply. While all the buildings complied with the standards template for audio visual and connectivity, each presented unique challenges that required custom deviations from the standard in order to successfully execute the retrofit.  Existing spaces were fully demolished down to the floor plate. The grid remained, but all lighting was reworked to conform to the new design. This was the third stage of a three-stage refresh, with our team having previously delivered stages 1 and 2.

SERVICES
Mechanical Engineering | Electrical Engineering | Audio Visual Design | Communications Design


PROJECT FEATURES
Status: Completed 2017


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
Complex and compressed schedule | Design template had to be customized by location | All lighting reworked to conform to design 


— Image courtesy of HOK

Queen’s University

15 MW Cogeneration Facility

Acting as the Owner’s Engineer and Project Manager for Queen’s University, our involvement included: cogeneration plant design outline, equipment performance criteria, economic analysis review, the creation of project specific EPC&M contract documents, liquidated damages and insurance requirements, administration of contract documents, and life cycle analysis of tendered submissions.

The project-specific EPC&M contract included the Expression of Interest process, preparation of request for proposals (RFP) for engineering, as well as procure, construct and maintain contacts.

We also provided design review, schedule and cost management, scope control, contract administration, inspection services, commissioning assistance, and management and contract close out.

HH Angus was also retained for utility interface items, including design of the 44kV grounding transformer, transfer protection trip system and the natural gas letdown station.

SERVICES
Mechanical Engineering | Electrical Engineering


PROJECT FEATURES
Status: Completed 2007


LOCATION 
Kingston, Ontario


KEY SCOPE ELEMENTS
Plant design outline | Economic analysis review | Project specific contract documents | Contract documents administration | Life cycle analysis | Design review | Design of 44kV grounding transformer


Town of Innisfil

Innisfil Public Library

The Town of Innisfil lies on the western shore of Lake Simcoe, some 80 kilometres north of Toronto. From its beginnings as a lumber region, it evolved into a cottage community and then into a rural residential centre, as more and more cottagers turned their properties into year-round homes.

Today, permanent residents account for over 90% of the population, supported by expanded municipal services such as the community library.

HH Angus’ scope for this library renewal and expansion project included upgrading existing and adding new HVAC, plumbing, electrical and lighting systems in both the renovated and new spaces.

The site consisted of 11,500 ft2 (1,068m2) of existing space and an adjoining new construction of 11,000 ft2 (1,022m2).

SERVICES
Mechanical Engineering | Electrical Engineering | Lighting Design


PROJECT FEATURES
Size: 11,500 ft2 renovation and 11,000 ft2 of new construction | Status: Completed 2015


LOCATION 
Innisfil, Ontario


KEY SCOPE ELEMENTS
Innovative-mechanical, electrical and lighting design for the library | Upgraded and added new HVAC, plumbing, electrical and lighting in both renovated and new spaces


Infrastructure Ontario

Forensic Services and Coroner’s Complex

The Forensic Services Complex is an exceptional facility to deal with the demand for forensic investigations in support of criminal prosecutions and community safety through two critical forensic investigation agencies: the Centre of Forensic Sciences (CFS) and the Office of the Chief Coroner (OCC).

HH Angus provided mechanical, electrical and communication compliance engineering to the project. Our exemplar design developed highly energy efficient mechanical and electrical systems that established a benchmark for low operating costs for the facility.

CFS provides forensic examinations for cases involving injury or death in unusual circumstances and in crimes against persons or property, and investigates more than 8,000 cases per year. Specialities include biology, chemistry, electronics, toxicology, document and photographic analysis, firearms and tool marks. The OCC conducts approximately 20,000 death investigations every year.

SERVICES
PDC - Mechanical Engineering (Compliance) | Electrical Engineering (Compliance) | Communication Engineering (Compliance)


PROJECT FEATURES
Size: 485,000 ft2 | Status: Completed 2013


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
Developed advanced design for highly efficient mechanical and electrical systems | Improved specimen storage and refrigeration | State of the art forensic labs


RBC/CBRE

180 Wellington West Refresh

Built almost 40 years ago, the office tower at 180 Wellington Street West is situated in the downtown Toronto core. To accommodate increased occupancy, the 12-storey building needed a refresh and new office space. Tenant retrofits were performed on 11 floors of office space to increase floor space and to improve tenant comfort. The first floor was fitted for amenities.

HH Angus provided mechanical and electrical design for the base building and interior upgrades to primary air handling systems, electrical distributions, and to washrooms throughout the floors.

Our project scope included 150,000 ft2 of tenant fitout, building recladding and base building upgrades, fire alarm replacement, perimeter fan coil system replacement, emergency power system and normal power system upgrades, as well as humidification system upgrades.

The key design challenge was how to answer the client’s expressed desire for increased visual transparency of the building’s exterior without creating a major penalty in energy efficiency. The design team recommended a solution, and we worked with the Architect to determine appropriate curtain wall components to achieve the client’s goal.

The building has been certified LEED EB Platinum.

SERVICES
Mechanical Engineering | Electrical Engineering | Lighting Design


PROJECT FEATURES
Size: 150,000 ft2 | Status: Completed 2013


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
M&E for base building | Interior upgrades to primary air handling systems, electrical distributions, and washrooms | New perimeter glazing | Reduced energy consumption | LEED EB Platinum certified 


Benefiting the client

Our design included more perimeter glazing and daylighting without an energy penalty, and decreased lighting density by 7 watts/ft2.

Reducing energy costs

We designed a whole new lighting layout for the entire building, complete with photometrics, LED technology, daylight harvesting and occupancy controls help reduce lighting density.