Confidential Client

Data Centre Refresh & Expansion

This 1992-designed data centre had reached its capacity in power, white floor space and cooling. With hot spots and legacy equipment throughout, the entire power plant needed replacement.

This was a major project to conduct on a live data centre for a premier financial institution. From 2008 to 2013, HH Angus was involved in more than 15 projects on the site. Starting with “bridge” programs to get the data centre through difficult transitions in data, power and cooling deficiencies, to the completion of a 6 MW power upgrade with new power plant and cooling capabilities that allowed for the complete removal of the aged UPS and generator systems. This required hundreds of hours of planning and phased construction, including temporary generators and additional UPSs.

As Prime Consultant for all the projects, HH Angus was responsible for structural, architectural, noise abatement and air emissions subconsultants. We managed the contracts and contractors for the mission critical facility - everything from MOP, design, schedules, budgets and strategies planning were within our role and responsibilities.

The largest single project was $80M in value and involved an expansion with new generators, UPS, batteries and distribution gear. The new facility was then tied into the existing building infrastructure, path by path, until the entire building was brought over to the new infrastructure.

Reconfiguring the rack layouts assisted in optimizing cooling capabilities, upgrading capacity of undersized CRAC units, while at the same time implementing tighter cooling tactics with hot and cold aisle and ducted returns.

We then converted the entire DX building plant to a chilled water system in a 100% loaded 7/24 data centre, providing large savings in capital expense and lower operating costs by over $100,000 per year. The program was incorporated into a roof replacement and CRAC equipment refresh that saved more than $1 million in deferred capital expenses.

HH Angus was deeply involved in supporting the confidential data centre’s strategy over six years. Our roles included Strategic Planning, Feasibility Analysis, Prime Consulting, Procurement, MEP Engineering, and Commissioning services. The projects were many and varied, from condition assessment reports and feasibility studies, to a significant number of small to large projects to meet the challenges of rapidly evolving data centre business needs.

SERVICES
Prime Consultant | Strategic Planning | Mechanical Engineering | Electrical Engineering | Communications Design


PROJECT FEATURES
Status: Completed 2013


KEY SCOPE ELEMENTS
 
Introduced multiple projects over five years to replace entire power plant in a live, mission-critical data centre | ‘Bridge’ projects required to support transitions in data, power and cooling deficiencies | 6 MW power upgrade | Conversion of DX building plant to chilled water system, resulting in large CAPEX savings and $100K+ OPEX savings


Government of Canada Public Works

Millhaven Penitentiary, New Maximum Housing Unit

Millhaven Penitentiary is a maximum institution serving 400+ male offenders. It opened in 1971 and was built to replace Kingston Penitentiary, another maximum security prison (now closed). A riot at the Kingston Penitentiary forced Millhaven to open prematurely.

The Millhaven facility is in Bath Ontario, near Kingston and, together with a lower security prison, occupies 640 acres. Millhaven also comprises the federal intake assessment unit, and is one of two identically-designed institutions; the other is in Sainte-Anne-des-Plaines, Quebec.

This project represents the fourth of four residential-style living units on site. It created 96 new cells at the facility. HH Angus and Associates reviewed the federally-approved standard plans for prison housing and designed adaptations unique to this site, in order to permit construction of the new facility within the existing compound.

HH Angus conducted a review of the electrical infrastructure, and reworked mechanical loads to suit new climatic conditions. As well, we updated documents to ensure compatibility with current ASHRAE standards.

SERVICES
Mechanical Engineering | Electrical Engineering


PROJECT FEATURES
Size: 38,500 ft2 | Status: Completed 2013


LOCATION 
Kingston, Ontario


KEY SCOPE ELEMENTS
Provided federally-approved standard designs for prison housing | Reviewed & reworked electrical and mechanical infrastructure to suit new climate conditions | ASHRAE standards

Toronto Metropolitan University (formerly Ryerson)

Mattamy Athletic Centre

This redevelopment project included a 225,632 ft2 athletic facility incorporating an NHL-sized ice rink with seating for 2,796, a multi-purpose court with 1,000+ seats, a fitness centre, studios and a high performance gym. 

Elevating devices in this facility are readily available for public use and consist of two passenger elevators and three escalators. One large freight elevator (suitable for moving the ice-resurfacer) and a single Type B Material Lift were provided to manage the material handling requirements of the facility.

HH Angus provided Vertical Transportation Design Consulting to assist the architect in the design and selection of elevating devices for the Toronto Metropolitan University portion of this facility.

Photo credit: Toronto Metropolitan University 

SERVICES
Vertical Transportation Design


PROJECT FEATURES
Size: 225,632 ft2 | Status: Completed 2012


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
2 passenger elevators | 3 escalators | l large freight elevator | Type B Material Lift


University of Waterloo

Mike & Ophelia Lazaridis Quantum Nano Centre

To understand how small a single nanometre is (one billionth of a metre), one hair on your head is approximately 80,000 nanometres in diameter. A strand of your DNA is only 2 nanometres wide.

The Quantum Nano building features state-of the-art laboratories for Nanotechnology research, ion and atom trapping, nuclear magnetic resonance, low temperature superconductivity, quantum optical research and a suite of clean rooms for fabrication and testing of quantum and nanotechnology devices.

The building was not just innovative, it was completely unique in Canada. The type of research, science and learning taking place here is at the leading edge of nanotechnology science.

With rapid advances in science, HH Angus had to be proactive to ensure that the building’s lab infrastructure was flexible enough to serve both today’s researchers and future scientific endeavours.

We continued to collaborate and communicate long after our formal role on the project had ended. There were significant challenges in the operation of such a sensitive and complex building. We extended our involvement to train the Centre's operations staff and teach them how to tune the systems. For well over a year of support, we taught and solved issues that resulted in no changes to the design, simply passing on the knowledge of how to operate the building and how to diagnose clues to optimize performance. HH Angus’ dedicated team of engineers sees each of our building projects as a legacy for our client.

SERVICES
Mechanical Engineering | Electrical Engineering | Security & Communications | Vertical Transportation Design


PROJECT FEATURES
Size: 285,000 ft2 | Status: Completed 2013


LOCATION 
Waterloo, Ontario


KEY SCOPE ELEMENTS
Flexible design to serve future lab programs | Precision temperature control | UPS | Filtered electrical power 


Ground-breaking facilities

The Quantum Nano Centre and its infrastructure is recognized as a ground-breaking building able to support ground-breaking research, teaching and science.

Design excellence

The highly technical facility required not only high precision temperature, humidity, filtered electrical power, uninterrupted power supplies, but also the mechanical, electrical and communications infrastructure that would meet the architectural and structural requirements. 

Stakeholder involvement

This project was executed under the watchful eyes of multiple stakeholders.  There was ongoing collaboration between the building department, university user groups and supervisors, international leaders in quantum computing and nanotechnology, as well as donors.

Queen’s University

Reactor Materials Testing Laboratory

“The facility provides a unique capability in Canada to support the development of materials for advanced reactor systems, and to improve our understanding of materials in use in existing reactors.”

– Rick Holt, Professor of Mechanical and Materials Engineering, Queen’s University

HH Angus has a long-standing and highly-valued relationship with Queen’s University, spanning many years and many diverse areas of the campus. For this project, we were engaged to provide mechanical and electrical engineering design services for the University’s new Reactor Materials Testing Laboratory (RTML). The RMTL is an exciting research endeavour for the Queen’s Nuclear Materials Group. It uses a proton accelerator to introduce damage into materials at a microscopic scale.

HH Angus was the M+E engineer for the specialized laboratory building. With TEM* and SEM** rooms requiring critical temperature and humidity control, and HVEE linear accelerator room, this building is a ‘function drives form’ project, with the laboratory equipment dictating all the infrastructure services and spaces. Significant time was spent to ensure appropriate services could be accommodated after the delivery of the equipment and to allow for changes in services that may occur with changing equipment.

The 8000 ft2 facility was custom designed to house electron microscopes and a linear accelerator for a specific research program. A highly specialized building, with toxic gas and radiation protection, the site features an accelerator hall, control room, services rooms, laboratories for specimen preparation and characterization, and working space for researchers.

A significant challenge that our team overcame was the design of mechanical and electrical building services that need to pass through the one-metre thick bunker walls for the linear accelerator room. The walls contain stray electrons, the potential for which also required the use of non-conductive chilled water. 

 

*Transmission electron microscopy (TEM) is a microscopy technique whereby a beam of electrons is transmitted through an ultra-thin specimen

** A scanning electron microscope (SEM) produces images of a sample by scanning it with a focused beam of electrons

SERVICES
Mechanical Engineering


PROJECT FEATURES
Size: 8,000 ft2 | Status: Completed 2013


LOCATION 
Kingston, Ontario


KEY SCOPE ELEMENTS
Specialized laboratory building | Critical temperature and humidity control | Toxic gas and radiation protection | M&E building services had to pass through one-metre thick bunker walls