Ministry of the Solicitor General

Adult Infrastructure Renewal Program

The Adult Infrastructure Renewal Program consolidated facilities in the provincially-run prison system in order to substantially reduce operating costs. 

The emphasis was on efficient construction, high security and very low staff requirements. HH Angus worked closely with the client to create an economical design based on double bunking, which accommodated a total of 4,700 beds (three 1,500 - 1,700-bed facilities) in the Ontario communities of Lindsay, Penetanguishene and Milton.

Each facility consists of modular housing units encircling central control posts, and has a large Admitting and Discharge area, medical unit, segregation and a women’s unit. All the facilities house both detainees awaiting trial and inmates with sentences under two years.

HH Angus was involved in the mechanical and electrical design engineering of these state-of-the-art facilities, which include ultra-modern features and advanced technologies for enhancing public safety.

Some of the new design and technical features include:

  • Video Remand - videoconferencing for routine bail and remand hearings. The program effectively reduces security risks, as well as costs associated with transporting prisoners.
  • Sallyport Double-Locking Door System - The first of two doors opens into a secure area of the facility. Staff open the second door in the sallyport system once they determine it is safe to allow movement through the halls. By monitoring all activity through a window, staff control the opening and closing of the doors, severely restricting inmate movement.
  • Control Station - A control station is located in the centre of each pod. The station has direct sight lines along halls and into all populated areas. The pods are self-contained units where inmates spend their days. This reduces the need for inmate movement throughout the facility.
  • Video Surveillance - Cameras provide the control station with comprehensive sight lines within any area of the pod.
  • X-Ray Scanning Imagery and Metal Detectors – These restrict the flow of contraband into the prison system. All visitors must pass through a metal detector, where items being carried into the facility are examined by x-ray.

SERVICES
Mechanical Engineering | Electrical Engineering | Planning, Design and Compliance (PDC)


PROJECT FEATURES
Status: Completed 2006


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
3 state-of-the-art-facilities | Added ultra-modern features to enhance public safety | Construction included double-bunking, which accommodated a total of 4,700 beds (across three 1,500 - 1,700-bed facilities) in the Ontario communities of Lindsay, Penetanguishene and Milton


General Motors of Canada

Truck Plant Fluids Tank Farm

HH Angus redesigned the pump house and storage tank farm providing automotive fluids to the vehicles in the truck assembly plant.

Our project scope covered replacing ten 50,000 litre and three 25,000 litre storage tanks. The system also required seven new truck offload pumps and twelve new plant delivery pumps. Because it was not an option to shut down the plant to facilitate the work, co-ordination and timing between the construction activities and plant operations was critical to the success of the project.

A steam-heated glycol loop heating system was provided for the storage tanks containing high viscosity fluids. Glycol was pumped through a closed loop system and controlled via temperature control valves in each tank.

Due to the flammable and combustible fluids stored at this facility, a four zone Aqueous Film Forming Foam (AFFF) fire protection system was used. The total calculated flow was greater than 3,000 USGPM. The fire protection system was interlocked electrically to the process function, and connected directly to both the in-house and municipal fire brigade to assure maximum protection and safety.

SERVICES
Mechanical Engineering | Electrical Engineering


PROJECT FEATURES
Status: Completed 2005


LOCATION 
Oshawa, Ontario


KEY SCOPE ELEMENTS
Replacement of ten 50,000 litre and three 25,000 litre storage tanks | Continuous plant operation required, necessitating high degree of coordination and precise timing | Tanks for high viscosity fluids required steam heated glycol loop | AFFF fire protection system 


Thunder Bay Regional Health Sciences Centre

The Hospital’s architectural design presented challenges that required innovative engineering to visually integrate lighting, heating, cooling, power and ventilation services throughout the building, while meeting the life safety requirement and respecting the architectural integrity of the design.

HH Angus was retained to provide the mechanical, electrical and vertical transportation consulting engineering for this 683,000 ft2 375-bed acute care facility on a greenfield site. The facility included the full range of departments found in an acute care hospital, as well as the regional cancer centre, ambulatory care, forensic mental health, and full kitchen and laundry facilities.  Subsequent projects delivered a cogeneration facility and the Northwestern Ontario Regional Cancer Centre at the Thunder Bay Hospital site.

For the main hospital, energy efficiency elements were a key component of the design. HH Angus worked extensively with the architects to calculate the optimum building orientation and amount of sun shading devices, and determined the optimal glazing and curtain wall specifications required to realize passive solar energy gains and reduce the hospital’s long-term overall operating costs.

The heating plant for the hospital consists of 4 X 350 BHP hot water boilers and 2 X 250BHP low water content steam boilers. The hot water distribution is handled through primary and secondary pumping with variable frequency drives on the pump motors.

Enhanced fire alarm and security systems were implemented to address a  design challenges posed by the forensic psychiatric unit.

The project used a construction management procurement approach, with sequential tendering geared to achieve fast track completion. The methodology involved significant coordination and interaction between the consulting and construction teams.

SERVICES
Mechanical Engineering | Electrical Engineering | Vertical Transportation Design


PROJECT FEATURES
Size: 683,000 ft2 | Status: Completed 2004


LOCATION 
Thunder Bay, Ontario


KEY SCOPE ELEMENTS
Greenfield hospital | Fast track completion | Full acute care departments, plus cancer centre, ambulatory care, and forensic mental health | Energy efficient design to reduce overall operations cost | Enhanced fire alarm & security systems 


User-friendly spaces

The hospital has a 460 ft. long, 25 ft. wide “main street” that forms the backbone of the building. It is constructed with wooden columns and beams, opening the space to the outdoors with 35’ curtain wall.

Working with a tight schedule

Under a fast track completion, this fully functional state-of-the-art hospital was designed and constructed within a short five-year timeframe.

A 360˚ service provider

HH Angus delivered design engineering for Thunder Bay Regional Hospital’s main acute care building, its mental health centre, its cogeneration plant, and the Northwestern Ontario cancer centre on the same site.

Town of Aurora

Landfill Gas System

Landfills produce biogas, a combination of methane, carbon dioxide and nitrogen, typically with an energy content of approximately 500 BTU/ft3. Ontario’s Ministry of the Environment mandated that landfills of a certain size are required to collect and combust the biogas they produce.

It is an obvious benefit to be able to capture the renewable energy being collected from these landfills. HH Angus was retained to provide technical expertise in the development of a 1MW electricity-generating project at the closed Waste Management landfill site in Aurora.

As design engineer, HH Angus produced detailed mechanical and electrical plans for the installation. Additional responsibilities included: obtaining a parallel generation agreement with Aurora Hydro Connections Ltd. in order to feed electricity onto the grid; amending the site’s existing MOE Certificate of Approval; and working with the Town of Aurora for planning approval.

The power generation set was installed in July 2005 and was operating on landfill gas by late September, with final approval from Aurora Hydro to inject “green” power into the grid.

SERVICES
Mechanical Engineering | Electrical Engineering


PROJECT FEATURES
Status: Completed  2005


LOCATION 
Aurora, Ontario


KEY SCOPE ELEMENTS
Produced detailed mechanical and electrical plans for installation | Procured parallel generation agreement with Aurora Hydro | MOE Certificate of Approval amended for the site | Worked with Town of Aurora to obtain planning approval


A decade of ‘green’ power

Based on age and size, the Aurora landfill had enough fuel to operate a 1MW generator for at least ten years.

Toronto Transit Commission

Bayview Station – Sheppard Line

The Sheppard line is the TTC’s shortest subway line and opened in 2002. It is entirely underground, and has five stations on 5.5 km’s of track. The Bayview Station was designed for a 5-car train with a future platform roughed in for a 6-car train.

The above-grade buildings included the main entrance building, which incorporates an electrical substation, automatic entrance and secondary entrance with an under-street tunnel to the main concourse. The station was built as a cut and cover construction project.

The mechanical engineering design included tunnel ventilation, smoke venting fans, ventilation and air conditioning of service spaces, sanitary and storm drainage for washrooms and service areas, track drainage and fire protection systems.

The electrical scope included power distribution, lighting and communications systems. Design layouts were provided for power distribution of the subway station, as well as traction power for the trains. Lighting designs were provided for exterior public areas.

The communications systems included fire alarm protection, public address speakers, passenger intercom, TTC pax telephones, public telephones and security systems including closed circuit television.

SERVICES
Mechanical Engineering | Electrical Engineering | Communications | Security Design


PROJECT FEATURES
Status: Completed 2000


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
Tunnel and smoke ventilation | Air conditioning | Sanitary and storm drainage, track drainage and fire protection system | Communication system design included TTC pax telephones, public telephones and security systems, including closed-circuit television


Ensuring team coordination

Close coordination with the architectural, structural and other consultants was needed, in order to integrate the various mechanical and electrical systems into the station structure. Services were extensively embedded.

Collaborating for successful delivery

Engaging the key stakeholders from the client’s design and operations teams, the design team and project management team was instrumental to successful design implementation. Our design was highly detailed, to ensure the installation contractors could both bid the project with confidence and construct it successfully.