Children's Hospital of Eastern Ontario (CHEO)

Parking Garage

 
 
 

HH Angus is part of the EllisDon Infrastructure team awarded the Design-Build-Finance (DBF) contract for the new CHEO Integrated Treatment Centre (also known as 1Door4Care).

As part of this redevelopment, HH Angus provided mechanical and electrical engineering and fire protection design services for the design of a new 7-storey, 1,050 space parking garage for the hospital which addresses current demand challenges while supporting future growth of the healthcare campus. The new parking garage includes 94 accessible parking spaces and 21 electric vehicle (EV) charging stations.

HH Angus is also providing mechanical engineering services for the design of the new 6-storey, 233,000 ft2 CHEO Integrated Treatment Centre with anticipated completion in Fall 2027.

SERVICES
Mechanical Engineering  | Electrical Engineering | Fire Protection Design


PROJECT FEATURES
Size: 7 storeys, 1050 space parking garage | Status: Completed 2025


LOCATION 
Ottawa, Ontario