Niagara Health System 

ICAT Strategy

“Angus Connect’s approach to developing the ICAT Design Program for the new South Niagara Hospital was both forward-looking and grounded in reality, giving us a solid foundation as we move into Stage 3 of our redevelopment project. We really appreciated their fresh perspective on emerging technology, and in-depth knowledge of the opportunities and risks inherent in these types of projects.”

Sime Pavlovic, CIO, Niagara Health

Niagara Health (NH) operates five hospitals and community care facilities in the Niagara Region, serving a diverse population of nearly half a million people and the second highest percentage of seniors aged 65+ in Ontario. The new South Niagara Hospital is expected to consolidate three of the existing sites into a state-of-the-art facility located south of Niagara Falls.

Angus Connect was engaged to help NH achieve their ICAT vision by translating the future state vision into a forward-looking and feasible ICAT design program which could be easily translated into Project Specific Output Specifications (PSOS) as part of Stage 3. Niagara Health was able to capitalize on a unique opportunity, having recently constructed the new St. Catharines Site hospital (2013) which incorporated many current ICAT solutions at the time – the lessons learned from this redevelopment project were addressed as part of the ICAT design program, along with governance and change management recommendations.

In order to complete this work, we participated in the development of the ICAT vision and principles, then developed evaluation criteria and prioritization of ICAT solutions. Our team took a novel approach to stakeholder engagement, categorizing technology options as bronze, silver or gold in order to indicate various levels of implementation and to stimulate productive discussion regarding the functional requirements and use cases for clinical, business and building systems. The output from these sessions was summarized into solution profiles which detailed system requirements, key outcomes & performance indicators, governance, change management strategies, potential risks and challenges (along with mitigation measures), and proposed scope to support Stage 3 documentation.

Finally the ICAT solutions were mapped onto an eight-year implementation plan which addressed both pre-construction and post-construction activities, in addition to those in scope for the redevelopment project. Our team also generated a comprehensive budget cost estimate which included evaluation of potential funding sources based on our previous experience working on Infrastructure Ontario and MoHLTC-funded projects.

 

SERVICES
ICAT Strategy | Planning, Design and Compliance (PDC)


PROJECT FEATURES
Status: Completed 2020 | Multi-site hospital system which competes with US hospitals due to its proximity to the border | Unique opportunity to incorporate into the design program lessons learned from recent construction of St. Catharines Site hospital


LOCATION 
Niagara Region, Ontario


KEY SCOPE ELEMENTS
Angus Connect successfully delivered a detailed ICAT Design Report in less than three months, including a roadmap, equipment planning and budget cost estimates | Angus Connect presented its findings from the ICAT design at the Niagara Health Innovation Conference in February 2020


Fraser Health Authority

Royal Columbian Hospital Redevelopment

The Royal Columbian Hospital is the oldest hospital in the province of B.C. and one of the busiest in the Fraser Health Authority. Royal Columbian provides expert care to the province's most seriously ill or injured. It is the only hospital in B.C. that caters to trauma, cardiac care, neurosurgery, high-risk, obstetrics, neonatal intensive care, and acute mental health care all on one site.

HH Angus and Associates is serving as the Planning, Implementation and Closeout Consultant for the Fraser Health Authority’s large, multi-phase redevelopment for Royal Columbian Hospital (RCH) in New Westminster, BC. 

RCH is British Columbia’s oldest hospital, and one of only two adult trauma centres in the Lower Mainland. The plan, rolling out in three proposed phases over a decade, will see a major expansion of the acute care campus, with upgrades to critical infrastructure.

Phase 1 included a number of projects to help prepare the hospital’s infrastructure for future expansion. These were a new energy centre; a five-storey, 75-bed mental health and substance abuse facility; underground parking for 450 cars; and a regional data centre which will serve all Fraser Health sites, including 12 hospitals and a large group of community healthcare centres serving a population of 1.6 million.

Phase 1 design challenges included the site itself, which is a steeply sloped, truncated triangle constrained on four sides by roadways. Working closely with CannonDesign, we developed an Indicative Design to ensure the site would work for a mental health building while accommodating the energy centre.

Other challenges included complex scheduling issues to maintain reliable services to the site as the new Energy Centre replaced the old one, and the design of a new, large heating, cooling and electrical plant to serve the current and future RCH campus. HH Angus engineers drew on their deep experience in delivering large healthcare projects to project the future heating, cooling and electrical demands on the Energy Centre that would support the long-term needs of RCH for buildings not yet designed.

Phase 2’s new Acute Care Tower will house a number of services, including emergency, surgery, intensive care and inpatient rooms. Expansion and renovations to the existing buildings will follow in Phase 3.  New buildings will be designed to LEED Gold green building standards, and incorporate BC wood, as part of Fraser Health's and the Province's commitment to sustainability.

Image courtesy of Fraser Health.

SERVICES
PDC - Mechanical Compliance Engineering | Electrical Compliance Engineering | Vertical Transportation  Compliance


PROJECT FEATURES
Status: Phase 1 – work is finished, Phase 2 – ongoing | Buildings being designed to LEED Gold


LOCATION 
New Westminster, BC


KEY SCOPE ELEMENTS
Planning, Implementation and Closeout Consultant | Phase 1 includes a number of projects to help prepare hospital infrastructure for future expansion | Phase 2 Acute Care Tower


Infrastructure Ontario

Forensic Services and Coroner’s Complex

The Forensic Services Complex is an exceptional facility to deal with the demand for forensic investigations in support of criminal prosecutions and community safety through two critical forensic investigation agencies: the Centre of Forensic Sciences (CFS) and the Office of the Chief Coroner (OCC).

HH Angus provided mechanical, electrical and communication compliance engineering to the project. Our exemplar design developed highly energy efficient mechanical and electrical systems that established a benchmark for low operating costs for the facility.

CFS provides forensic examinations for cases involving injury or death in unusual circumstances and in crimes against persons or property, and investigates more than 8,000 cases per year. Specialities include biology, chemistry, electronics, toxicology, document and photographic analysis, firearms and tool marks. The OCC conducts approximately 20,000 death investigations every year.

SERVICES
PDC - Mechanical Engineering (Compliance) | Electrical Engineering (Compliance) | Communication Engineering (Compliance)


PROJECT FEATURES
Size: 485,000 ft2 | Status: Completed 2013


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS
Developed advanced design for highly efficient mechanical and electrical systems | Improved specimen storage and refrigeration | State of the art forensic labs


Michael Garron Hospital

Patient Care Centre ICAT Strategy and Implementation

HH Angus is on the Compliance team for the new eight-storey Ken and Marilyn Thomson Patient Care Centre project at Michael Garron Hospital (MGH), a large community hospital in Toronto’s East York area. The project includes a three-storey connection, as well as demolition and renovations to the existing hospital.

The Redevelopment will add approximately 550,000 ft2, including a new 8-storey tower to house inpatient and mental health beds, ambulatory clinics and a new underground parkade to support the site. It also includes approximately 100,000 ft2 of renovation within the existing facility, including a Cardiac Catheterization Suite and administrative areas. The project is targeting LEED® Silver.

Our Angus Connect Division assisted in developing a long-term IT strategic vision for the Hospital, including directions, gap analysis, strategic recommendations and Information Technology (IT) solution options to support the hospital moving forward. The strategic plan needed to carefully balance resources with urgency, and to align the vision with the
redevelopment project.

Feedback and findings from stakeholder consultations were key inputs into the strategic recommendations. Angus Connect facilitated a Visioning Session with senior leadership to define a future state vision and evaluation criteria, and consulted with over 100 additional stakeholders over a two-month period in order to refine the Vision Statement, Guiding Principles and Key Strategic Themes; the output from these sessions was presented back to the clinical steering committee for validation. Angus Connect identified fifteen key recommendations based on the common challenges and opportunities raised during stakeholder consultations, leading to forty distinct ICAT solutions which were mapped out over the 5, 10, and 15 year timeframes according to their dependencies, impact and alignment with the vision.

With buildings dating back to 1927, one of the key challenges was integrating technology solutions across a campus with incredibly diverse infrastructure and systems. Our team provided an outline of enabling works projects required to support the transition to more modern systems, while considering the clinical and operational impact – this analysis led to a more holistic approach to planning, more accurate costing and better risk mitigation.

Since that work, Angus Connect was engaged in the Compliance role for the Hospital for Stages 3, 4 and 5, assisted with implementing the ICAT strategy, and also prepared the PSOS (project specific output specifications) for ICAT systems and integration requirements for the integration matrix and interoperability use case definition.

SERVICES
Planning, Design and Compliance (PDC), ICAT Strategy  


PROJECT FEATURES
Size: 550,000 ft2 | Status: Completion 2023


LOCATION 
Toronto, Ontario


PROJECT FEATURES
Integration of new and existing M&E and IT infrastructure | Developing long term IT strategic vision towards EMRAM 7 |  Prepared PSOS for ICAT systems and integration requirements | ICAT Strategy and 15 year roadmap that considered advanced
technologies and their impact on patient care | First significant use of ICAT in the Day in the Life scenarios | Produced over 150 use cases for technology workflows and interoperability


 

Designing for Safety

The Hospital aims to achieve EMRAM level 7, the highest level in becoming a paperless and digital facility. It also looks to identify automation opportunities to become a smarter hospital.

— Images courtesy of Michael Garron Hospital

Michael Garron Hospital

Ken and Marilyn Thomson Patient Care Centre

Michael Garron Hospital’s new 8-storey Patient Care Centre will include inpatient and mental health beds, ambulatory clinics and an underground parkade. The project also encompasses ~100,000 ft2 of renovations within the existing hospital.

Much of the existing infrastructure at Michael Garron Hospital (MGH) has reached the end of its lifecycle, with some buildings dating to the 1920s. HH Angus was engaged as part of the Planning Design and Compliance Team (PDC) for the new Patient Care Centre, responsible for generating performance-based documents to facilitate design of the new facility.

The project specific output specifications development process included options for expanding central plant systems (heating and cooling), augmenting and unifying the campus emergency power system, replacing aged electrical substations, phasing, design standards, and technical guidelines. Incorporating operations, life cycle and maintainability requirements were of the utmost importance for this project, as responsibility for the ongoing facilities operation and maintenance will rest with MGH.

Enabling projects

To prepare the site for construction, several physical elements were relocated and/or demolished. HH Angus worked with MGH to provide mechanical and electrical engineering for the “Enabling Projects”.

These included relocation of bulk oxygen and bulk nitrous oxide, relocation of bulk chemical storage, demolition of E-Wing and F-podium, and decommissioning a major service tunnel. This work involved complex sequential construction phasing and shutdowns to maintain operation of the Hospital.

HH Angus’ ICAT group, Angus Connect, assisted MGH with development of a long-term strategic vision, directions, gap analysis, strategic recommendations and IT solution options for information technology (IT) to support the hospital moving forward. The team built upon this strategy document to develop the design specifications as part of the compliance role.

The new Patient Care Centre is Phase 1 of an ongoing redevelopment, and is targeting LEED Silver.

Image courtesy of Michael Garron Hospital.

SERVICES
PDC - Mechanical Compliance Engineering | Electrical Compliance Engineering | Vertical Transportation Design Compliance | IMIT Compliance


PROJECT FEATURES
Size: 550,000 ft2 | Status: Completion 2023


LOCATION 
Toronto, Ontario


KEY SCOPE ELEMENTS 

Integration of new and existing M&E and IT infrastructure | Developing long term IT strategic vision towards EMRAM 7 |  Prepared PSOS for ICAT systems and integration requirements | Targeting LEED® Silver