Confidential Client

Data Centre Expansion

Data centres operate 24/7. This large Tier 3 facility expansion required defined levels of redundancy to ensure the most complete reliability possible.

Our mechanical and electrical design included a central cooling plant and emergency generation system to support the critical data floors.  The development involved a two-phase ‘design and construct’ concept, which was incorporated into the base design and operating strategy. The project was executed on time and within budget.

Mechanical Design

The Phase 1 concept required 3 X 750 ton centrifugal chillers, electrically powered with variable frequency drives (VFD’s) and incorporating N+1 redundancy. The chilled water distribution system was based on a primary and secondary concept with a ring main for increased redundancy, which allowed for back feeding in the event of hardware failure. All pumps have VFD’s for slow start and energy efficiency. Transformers were used to step down from 600V to 460V to further increase reliability on the VFD’s. The condenser water system was based on induced draft with counter flow cooling towers with VFD’s on the fans and utilizing tower free cooling for energy efficiency.

The design of the cooling system provided for Phase 2 expansion and the ability to implement an additional 2250 tons of cooling through 3 X 750 ton chillers, with improved redundancy to (N+2). The mechanical piping and ventilation design was carried out using Bentleys Autoplant 3D software to ensure functionality of the equipment and piping layout design. The 3D modeling was used successfully by the Constructor and integrated into their BIM (Building Information Modeling) program.

Electrical Design

The electrical engineering design provided for a 50,000 ft2 raised floor computer area serviced by redundant feeds from the existing 27.6kV distribution to redundant 600V distribution systems. Four 2 MW parallel synchronized diesel generators with capacity to increase to six; two systems of four redundant 750 kVA UPS modules; and state-of-the-art life safety, alarm monitoring, and security systems.

Subsequent upgrades to the facility included installation of two 3000A Static switches to the two parallel redundant 750kVA UPS systems, configured to not only permit seamless transfer of critical loads between utility and emergency power in the event one UPS system fails, but also to permit seamless transfer to the surviving UPS system. HH Angus functioned as Prime Consultant and Electrical Engineer for a series of reports, studies, distribution upgrades and raised floor expansions at the site.

The Data Centre’s diesel generator system included three buried storage tanks, each with a capacity of 75,000 litres, a generator ventilation system and diesel exhaust for four 2MW generators.

ICT Scope

Our communications group was involved with multiple communications projects for the expansion, starting from the structured cabling system, DAS –Distributed Antenna System, and building systems LAN/WLAN design. We provided a detail compliance analysis of the new proposed sites with references to the TIA 942 Data Centre standard.

As a part of the DAS, we provided an unbiased, independent assessment of the current data centre cabling infrastructure performance, as well as design recommendations and specifications to eliminate both scheduled and unscheduled downtime. The assessment included a comprehensive computer room site inspection, determination of the full scope of the telecommunications needs, design of a suitable structured cabling system, and the creation of written reports, prints and specification documents. 

SERVICES
Advisory Services | Mechanical Engineering | Electrical Engineering | Communications Design  


PROJECT FEATURES
Status: Completed 2010


KEY SCOPE ELEMENTS
Comprehensive assessment of existing IT infrastructure | Engineering for structured cabling systems, DAS and building LAN/WLAN design | Identified full scope of telecommunication requirements | N+1 redundancy | 3 X 750 ton centrifugal chillers powered by VFD's | Multiple communications projects


Designing for Uptime

Reliability was improved with underground remote water storage to support a 24-hour cooling tower make up in the event of supply water failure.

Electrical reliability was achieved through the installation of 6 X 2 MW diesel generators (N+1 redundancy), and a fuel storage facility consisting of 3 X 75,000L underground tanks.

 

Confidential Client

Data Centre Refresh & Expansion

 
 
 

This 1992-designed data centre had reached its capacity in power, white floor space and cooling. With hot spots and legacy equipment throughout, the entire power plant needed replacement.

This was a major project to conduct on a live data centre for a premier financial institution. From 2008 to 2013, HH Angus was involved in more than 15 projects on the site. Starting with “bridge” programs to get the data centre through difficult transitions in data, power and cooling deficiencies, to the completion of a 6 MW power upgrade with new power plant and cooling capabilities that allowed for the complete removal of the aged UPS and generator systems. This required hundreds of hours of planning and phased construction, including temporary generators and additional UPSs.

As Prime Consultant for all the projects, HH Angus was responsible for structural, architectural, noise abatement and air emissions subconsultants. We managed the contracts and contractors for the mission critical facility - everything from MOP, design, schedules, budgets and strategies planning were within our role and responsibilities.

The largest single project was $80M in value and involved an expansion with new generators, UPS, batteries and distribution gear. The new facility was then tied into the existing building infrastructure, path by path, until the entire building was brought over to the new infrastructure.

Reconfiguring the rack layouts assisted in optimizing cooling capabilities, upgrading capacity of undersized CRAC units, while at the same time implementing tighter cooling tactics with hot and cold aisle and ducted returns.

We then converted the entire DX building plant to a chilled water system in a 100% loaded 7/24 data centre, providing large savings in capital expense and lower operating costs by over $100,000 per year. The program was incorporated into a roof replacement and CRAC equipment refresh that saved more than $1 million in deferred capital expenses.

HH Angus was deeply involved in supporting the confidential data centre’s strategy over six years. Our roles included Strategic Planning, Feasibility Analysis, Prime Consulting, Procurement, MEP Engineering, and Commissioning services. The projects were many and varied, from condition assessment reports and feasibility studies, to a significant number of small to large projects to meet the challenges of rapidly evolving data centre business needs.

SERVICES
Prime Consultant | Strategic Planning and Advisory Services | Mechanical Engineering | Electrical Engineering | Communications Design


PROJECT FEATURES
Status: Completed 2013


KEY SCOPE ELEMENTS
 
Introduced multiple projects over five years to replace entire power plant in a live, mission-critical data centre | ‘Bridge’ projects required to support transitions in data, power and cooling deficiencies | 6 MW power upgrade | Conversion of DX building plant to chilled water system, resulting in large CAPEX savings and $100K+ OPEX savings