Service: Commissioning
Halton Healthcare
Oakville Trafalgar Memorial Hospital
As a large super hospital, this greenfield ~ 1.5 million ft2 facility features ORs, Emergency Department, Diagnostic Imaging, Mental Health, Long term Critical Care, and Dialysis services. There is also a large central kitchen and central Sterile Processing department. The hospital has been certified LEED Gold NC, exceeding its target of LEED Silver NC.
The central utility plant provides 4200 tons of cooling, 1500 bhp of hot water and 1500 bhp of steam. There is 15 MW of generator capacity onsite, along with 72 hours of fuel oil storage and a large fuel oil distribution system.
Some of the complexity inherent in this project was due to the design work being split between multiple engineering companies, which significantly increased the amount of coordination required. A key challenge was simply the scale of the new hospital, which increased the complexity of all of the systems. It required integration of systems across multiple engineering companies who were producing different portions of the design.
Another challenge was the extremely tight project schedule. This meant that tasks, which are normally completed sequentially, had to be done concurrently. This required very exacting planning and accelerated design work. Regular meetings with multiple engineering and architecture disciplines allow parties to bring their issues and design requirements to the table and to work through them in a collaborative way.
The vertical transportation design scope included 33 elevators servicing the main hospital building and 3 providing service to the parking garage.
The project co. required commissioning support for the contracting team in order to achieve milestones. HH Angus assembled a separate team of technical personnel to blitz specific systems in a 7-week period. With little preparation time, HH Angus leveraged members of the design team to train the commissioning personnel prior to going to site.
SERVICES
Mechanical Engineering | Vertical Transportation Consultant | Commissioning Support
PROJECT FEATURES
Size: 1.5 million ft2 | Completed 2015 | Greenfield super hospital project | LEED Gold
LOCATION
Oakville, Ontario
KEY SCOPE ELEMENTS
Central Utility Plant provides 4200 tons of cooling, 1500 bhp of hot water and 1500 bhp of steam | 36 elevators serve the hospital and parking facilities

Alternate approach to Cx
Through a cycle of improvements in methodology, HH Angus was able to improve productivity on site by more than 100% with an alternate approach to commissioning, which was shared with other onsite commissioning groups.
TELUS Canada
Rimouski Super Internet Data Centre (SIDC)
“With our new Internet Data Centre, companies can now harness the power of managed hosting and cloud computing solutions that are not only reliable, secure and flexible, but also hosted, managed and delivered in Canada.”
— François Gratton, President of TELUS Quebec and Atlantic
The new TELUS Tier III design-certified centre was the first TELUS Internet Data Centre built to LEED® Gold standards. It is directly connected to the national TELUS IP network and interconnects into existing data centres across the country, creating what has been described as the most advanced and regionally diverse computing infrastructure in Canada.
The Intelligent Internet Data Centre incorporates innovative, non-traditional solutions, such as a closed-loop cooling system that provides unparalleled operating efficiency. The first of its kind in the world, this system is 180 times more efficient than a traditional cooling plant.
TELUS reports a PUE* of 1.15 for the Rimouski SIDC, which put TELUS at the forefront of the industry. The new data centre has a modular design, enabling TELUS to rapidly expand capacity and to tailor its offerings to the most advanced and efficient technologies available.
HH Angus acted as the Owner’s Commissioning QC Representative. Our responsibilities included review of the commissioning plan, schedule and test scripts prepared by Commissioning Agent; site observation reports to the stakeholder team - these covered the 27.6kV incoming switchgear complete with automatic transfer scheme, diesel rotary UPS system, automatic transfer switches, 600V distribution switchboards, Electrical Monitoring System (EMS), ISOT and Black Start Testing. In addition, HH Angus was also the Owner's Representative for the Uptime Institute On- Site Tier III Accreditation Audit.
We’re proud that we won this assignment—as the Owner’s Commissioning Rep for TELUS’ first purpose-built Data Centre—thanks to our experience in data centre construction and our excellent communications with the client.
* Power Usage Effectiveness is the Uptime Institute’s classification system, an internationally recognized benchmark to assess the reliability of data centres.
SERVICES
Owner’s Representative through Commissioning | Owner’s Representative for Uptime Institute On-site Tier III accreditation audit
PROJECT FEATURES
Status: Completed 2012
LOCATION
Rimouski, Quebec
KEY SCOPE ELEMENTS
Overall review of commissioning plans and schedule | Site observation reports
TELUS
Super Internet Data Centre, Kamloops BC
“The Kamloops Internet Data Centre will be the cornerstone of our national next-generation cloud computing services, handling complex data storage and offering unsurpassed connectivity, superior functionality, state-of-the-art security and industry-leading reliability to our clients.”*
Lloyd Switzer, TELUS Senior VP, Network Transformation
The new TELUS Tier III design-certified data centre was the first TELUS Super Internet Data Centre built to LEED Gold standards. It is directly connected to the national TELUS IP network and interconnects into existing data centres across the country, creating what has been described as the most advanced and regionally diverse computing infrastructure in Canada.
The Intelligent Internet Data Centre incorporates innovative, non-traditional solutions, such as a closed-loop cooling system that provides unparalleled operating efficiency. The first of its kind in the world, this system is 180 times more efficient than that of a traditional cooling plant.
TELUS reports a PUE** of 1.15 for the data centre, which put TELUS at the forefront of the industry. The new data centre has a modular design, enabling TELUS to rapidly expand capacity and to tailor its offerings to the most advanced and efficient technologies available.
SERVICES
Mechanical Engineering | Electrical Engineering | Security Design | IMIT Engineering | Vertical Transportation Consulting | Lighting Design
PROJECT FEATURES
Status: Completed 2012
LOCATION
Confidential
KEY SCOPE ELEMENTS
Modular construction with reduced on-site fabrication | Inaugural installation of patented cooling system

Ensuring Quality Control
HH Angus acted as the Owner’s Commissioning QC Representative. Our responsibilities included review of the commissioning plan, the schedule and test scripts prepared by Commissioning Agent and the site observation reports to the stakeholder team - these covered the 27.6kV incoming switchgear complete with automatic transfer scheme, diesel rotary UPS system, automatic transfer switches, 600V distribution switchboards, Electrical Monitoring System (EMS), ISOT and Black Start Testing.
Tier III Accreditation
HH Angus was the Owner’s representative for the Uptime Institute On-Site Tier III Accreditation Audit.

**PUE, or Power Usage Effectiveness, is the Uptime Institute’s classification system, an internationally recognized benchmark to assess data centre reliability.
*BC Tech News: TELUS OPENS 75 Million Next Generation Cloud Computing Data Centre in Kamloops