Paul Keenan
P.Eng, PE, C.Eng., LEED® AP BD+C, Principal
President
Paul’s intimate knowledge of the firm, his focus on client-centric service, and his passion for our core company values are important assets as he leads the firm into our second century of operations.
Paul first worked at HH Angus as a coop student. He formally joined the staff as a mechanical engineering graduate in 1995, and soon proved himself to be a technically strong engineer and excellent mentor. In 2002, he became a Principal, responsible for hospital, laboratory, university and industrial design.
By 2004, Paul transferred to our UK office to lead engineering operations in London, where he played a key role on multiple buildings at the Canary Wharf development. Returning to Toronto in 2007, he was later promoted to Division Director, Commercial. In 2013, he was appointed Director of the Health Division, demonstrating exceptional leadership in our largest service portfolio. In 2019, Paul assumed the role of President of HH Angus.
Paul leads the day-to-day management of the firm and is focused on promoting HH Angus’ three corporate objectives: being a fully client-centric organization; doing right by its employees; and positioning the firm to thrive for its second 100 years.
Featured Projects
Oakville Trafalgar Hospital
1.5 million ft2 super hospital; LEED Gold
SickKids Peter Gilgan Centre for Research & Learning
740,000 ft2; LEED Gold certified; complex systems design for tight urban space
University of Guelph New Science Complex
360,000 ft2 new build research facility, including 3 floors of teaching labs